The work on the TerraBricks/CEB is going a bit more slowly than expected. The crew definitely is too small for this job, even though our house is not so big. The Green Machine purportedly is capable of making 300 bricks per hour. We should have had the Green Machine for two or two and a half days.The machine's been on-site for three times longer and they're just over half way through the brick making. However short-staffed and slow, they have been making progress making and stacking the bricks - steady and surely. In addition to stacking several layers of TerraBricks around the whole house, the crew set some posts to guide the plumb and level construction as they stack higher, as you'll see in these pictures.


Meanwhile, downstairs, the framing crew worked on Saturday to frame-in the walls for the guest bedroom, closet, and downstairs bathroom. We're concerned about where the sump and ejector pump pit were located, and what impact that may have on the closet, but it's too late to move that now since the concrete has been poured. We will be speaking with the contractor to find out why this is different than expected. There's probably a good reason, just one that, unfortunately, wasn't communicated to us.

No comments:

Post a Comment