Thursday, July 30, 2009

100th Blog Post






This marks our 100th post. And I'm happy to report there's been some more progress. In the past couple of days, our recycling dumpster was hauled away. We filled two dumpsters during the construction, which is less than 1/2 what typical construction sends to the landfill. And many of the items placed in our dumpster will be recycled instead of dumped.

Bob Demarr's crew spent about 7 hours fixing the problems with the rough grading caused by Bartley Corp's team. Bartley's job foreman admitted to Andreas that they really don't do grading work - they don't have the right equipment or labor. That showed with the mess they created. It took Andreas more than 30 hours to dig out tree protection fencing Bartley ran over with a machine and dumped dirt on top of. I spent another 10 hours uncovering the Holly Tree roots they graded over, even though the root protection zone is clearly marked on the grading plan. Alas, we're now on the right path with grading. Demarr's crew hauled away a few truck loads of dirt today, leaving the lot looking much better than it has the past six months!

Inside, Bernie from Clarke County Plumbing, continued work on the rough-in plumbing. He put the vent pipes through the roof (now Piedmont Roofing will come back to seal that all up) and worked on the basement bathroom. Ferguson delivered the tub, toilet wall carrier and shower faucet rough-in and Bernie will install that soon. He also drilled through the EIFS to prepare for the outdoor shower piping, the hose bibs, and the sump pump piping. Unfortunately, he drilled the sump pump holes too high - the sump pump pipes were supposed to come out beneath the deck - so we'll have to work with Bernie to get that resolved.

Also inside, Aaron laid the pex tubing for the bathroom radiant floor heating. I want the shower floor to be as toasty warm as the rest of the bathroom floor, so that had to be laid today so a first layer of concrete can go over the pex tubing in the shower tomorrow. Bernie can then protect the shower floor properly with the rubber membrane and when the concrete floor is poured, it will work out perfectly.

Elmer's crew started work today on the parging. They spent the day applying a metal lathe around the doors and windows. They'll finish that tomorrow then apply the thin layer of cement to the walls and round out the edges by the doors and windows. After that cures, I can apply the American Clay Earth Plaster over the cement parging.

Jay with Quality Window & Door hasn't provided the exact date yet for the corrected clerestory windows to be delivered - hopefully that will be in the early part of next week so the cedar siding can go on Thursday morning.

Monday, June 22, 2009

EIFS and Window Framing Progress

It's wonderful to stop by the lot after a long day at work and see that some progress was made on the house! I had a big smile on my face tonight. It was starting to get dark, so the pictures aren't the best, but they show the EIFS scratch coat that is being applied to the Compressed Earth Blocks and a few shots to show the new, corrected framing for the windows.

We've been struggling to get a plumber out to the lot to do the rough in plumbing and arrange for the sewer/water hook up with the street. The plumber we plan(ned) to use (that's still TBD depending how some open issues get resolved) was unavailable for an extended period of time, so we tried to get quotes from three other companies. One provided a high quote with no supporting detail. Despite multiple requests, they never provided any detail so, for all we know, they just picked a number out of the air. Two other companies came by and promised quotes quickly. Despite multiple follow-up phone calls, and even paging one of them after hours, not a single return call or quote has come our way. Last I checked we were in a recession of biblical proportions and people were desperate work. Guess that's not true for plumbers. Or it is true and none of them are good business people. Any thoughts on that readers?

The EIFS crew dropped their scaffolding off on Friday, the extruded foam board arrived today, and they applied their scratch coat to three sides of the house - West, North and East. They have only enough scaffolding for those sides, so they'll get to the Southern side later this week as they work their way around the house. Tomorrow they'll apply the foam board and the two coats of synthetic stucco follow.

The framers came back late this afternoon to complete what they couldn't last week because of the thunderstorms. They completed the framing so the 22 clerestory windows can be installed when they arrive. Our Construction Manager has left multiple messages for Jay at Quality Window and Door to get a status report on the windows, so Aaron can schedule the crew to come to install them. The new/correct windows supposedly were ordered on May 28 and would take 4-6 weeks for delivery. So that means late this week or sometime within the next two weeks we should receive those. It sure would be nice to get that status report. Maybe Jay's related to the plumbers? Just kidding - he probably is waiting to return Aaron's call until he has an update from the factory.

And maybe the best news of the day - the sump pump was plugged in tonight when I checked, and the basement was drying out nicely.





Wednesday, June 10, 2009

Grading in Progress













When I was a kid, like most boys, I enjoyed playing in the back yard with big toy trucks, pushing earth around, and having a gay old time getting dirty. Well, I would have loved to have been on-site yesterday as the crew starting moving piles of dirt around as they started on the final grading for the lot.

Bartley Corporation is doing the grading for us. They brought a Bobcat like machine, but one that has rubber treads, instead of metal treads, due to the rain and wetness of the dirt. Unfortunately, they didn't get very far when the rubber tread ripped and the machine became disabled. The machine still sits at the back of the house, waiting to be towed away. It's questionable as to when they'll be able to get a truck back there since the lot is a mud pit right now. At least the grading is now going away from the house which should prevent some of the water from coming in the basement. I checked the basement tonight, after last night's rain, and while it's still a bit damp in the basement, I didn't see any new water. That's a very good thing.