Saturday, May 1, 2010

Tree City USA

According to the Falls Church Times, the City of Falls Church "has maintained a Tree City USA designation for at least 31 years, longer than any other municipal entity in Virginia. The Tree City USA program is sponsored by the Arbor Day Foundation in cooperation with the USDA Forest Service and the National Association of State Foresters. The City qualifies because it has an urban forestry program overseen by a professional arborist, has an annual forestry work plan implemented by a tree care ordinance, funds the program through the annual budget, and organizes an Arbor Day observance."

That is part of why we had to have a tree preservation plan, and a replacement plan that provides a specific 10-year canopy coverage. The folks from Terra Landscape and Design were back at work on our property today, planting several trees for us, including:

- River Birch
- Yellow Wood
- Red Maple
- Canadian Serviceberry (2)
- Fringe Tree

Here are some photos of the installation from two weeks ago as Terra Landscape was planting them, and below that are five pictures showing how the new trees look today.




Add Image
And today (May 1):


River Birch



Yellow Wood

Two Canadian Serviceberry Trees

Red Maple


Fringe Tree



Saturday, January 23, 2010

Great Job Terra Landscape!

Our neighbor Mandy suggested we hire Maryann Ogle/Terra Landscape to do some landscaping work for us. We already were working with someone for the landscape design, but we needed someone to do hardscape work for us. So we met with Maryann, admired her ideas and energy, and got a quote that seemed fair for the huge amount of work required to install permeable pavers and a gravel driveway. We shared some pictures earlier of the walkway being installed, and now that the work is done on that, as well as on the driveway, here's a complete look at the process and finished product. We're thrilled with the results, and it's a joy to walk to the house without having to step through a mile of mud!


















Tuesday, December 29, 2009

Where Has The Time Gone????

I spent over 24 hours during the last two days working on the house, but I don't seem to have much to show for it. A lot of time was spent running to different stores (and stuck in traffic between stores). A lot of little items were needed, like wood filler to cover the nail holes on the baseboard and casing, and some big items too, like the double bowl granite/composite kitchen sink.

We're still waiting for the plumber and the electrician to show up. The electrician said he'd call when he's back from visiting family. I'm guessing that'll be some time in 2010. The plumber was scheduled to come yesterday to connect the gas line to the hot water heater, install the heat trap, the temperature control valve, and the expansion tank. He didn't show up, but he sent his father. He puttered around for an hour or so, installed the heat trap, and then left for the day, saying they'd be back Tuesday or Wednesday.

It seems like we're so close to finishing, yet so far away. Hoping to get closer and closer to the "finishing" idea, we are moving forward with Access National Bank to get our ducks lined up for the conversion from construction loan to mortgage. The appraiser came today to measure and look around. He seems to be familiar with the neighborhood and with green construction. We're keeping our fingers crossed that the appraisal comes in the same, or higher, than it did last year at this time when we were working to obtain our construction loan. I'm taking it as a good sign that today's Washington Business Journal email news summary led off with a story about real estate prices climbing in the DC area. Hopefully our appraiser read that story!

The highlight of today was when Jason and Matt, two City of Falls Church officials, came to inspect the final grading. We passed that inspection! Thanks to Bob DeMarr and his crew for fixing the job Bartley didn't get right but still wanted to charge a premium for. Immediately after passing the inspection, I called Maryann Ogle from Terra Landscaping to schedule the gravel driveway/parking area and the permeable paver walkway installation. The weather forecast isn't great for the next few days, but Maryann will monitor the weather and send the crew as soon as there's good news in the forecast. Maryann pointed us in the right direction to schedule wood chip mulch delivery from the City, so we'll soon (hopefully) receive a truck load of mulch to scatter along the lot.

I spent some time today working on the master shower. Another challenge I dealt with was that the master bathroom shower pan wasn't poured properly. There should have been a slope to the drain, but it ended us more like small hills and valleys. That left lots of places for water to settle, instead of drain. I rented a grinder from Ace Tool Rental in Falls Church and spent a good bit of the afternoon grinding down the high spots, checking with the level, and ensuring the water now heads towards the drain. I poured water into the shower pan and it all went in the right direction. Yay!

After that task was successfully completed, I laid out the 1" x 1" tiles for the shower floor to find the best fit using the least number of tiles. When we ordered the tiles at Amicus, we thought it would take 21 of the 12" x 12" tile mats, but I was able to configure it using only 17. Since we had to buy a box, which contains 24, that leaves me with an extra 7 sq.ft. of beautiful carbon floor tile. Hmmmm, what can I tile with that?

Tomorrow I'll mix up some Thinset and install the floor tiles. The wall tiles will follow. Another one of my shopping stops today was to order a threshold/sill for the shower curb. Actually, on my way back from IKEA yesterday, I stopped at Community Forklift (kind of like Habitat for Humanity's ReStore) but they were closed. I was looking for a remnant of granite, Silestone or marble for the threshold. Since I couldn't get it at Community Forklift, I bought a remnant retail. The advantage of buying the remnant retail is that they will polish both edges for me. The likelihood of finding that at a second hand shop was pretty slim.

Here are some miscellaneous pics, as well as the long-overdue photos of the completed deck (well construction has been completed - we'll stain it and seal it in the Spring time).










Thursday, October 29, 2009

Shopping Spree

I'm back from my Association's annual meeting & convention, which was very successful. The weeks leading up to the Convention were busier than usual, so I wasn't able to post to the blog. Since I returned last Friday, I've been catching up on work, and working on the Erdhaus.

Shopping for fixtures for the house has been a high priority and a nice diversion from all the work we have yet to do. We ordered tile for the bathrooms and bought LED lights at Amicus Green Building Center in Kensington, MD. The master bathroom will have porcelain tile (12" x 24" horizontal) dark grey tile for the shower walls, and 1" x 1" black (color=carbon) porcelain tile for the shower floor. We selected 18" x 18" ceramic tile for the guest bathrooms. The upstairs color is cocoa and the downstairs color is a light tan. It's kind of funny - Andreas said I could pick the tile colors for the guest bathrooms, as long as I didn't pick tan or brown. As it turns out, we picked the tile colors together, and the ones we liked best were tan and brown. The LED lights were on close-out. Perm lighting is the manufacturer and they were acquired by another company. So the discontinued model was being offered by Amicus for a great price ($70 per 6" recessed light). Obviously they are energy efficient.

From YLighting, we ordered three ceiling fans - one for the living room, one for the guest bedroom, and one for the master bedroom. The ceiling fans are the Velo line by Modern Fan Company.


Tom, the electrician, is scheduled to start installing the interior light fixtures next week. We're holding off on exterior installations until the deck is built.

Another selection we have made is for the walkway to the house. Maryann from Terra Landcaping brought over some permeable pavers and marked out with orange marking paint where the walkway will be. While we have the pavers for the walkway, we're electing to go with a simple gravel driveway/parking area (until I win the lottery and can afford to put permeable pavers there instead).

In addition to having fun shopping, we've been working hard on the projects that we're responsible for. Andreas posted photos of the stained concrete floor. We cleared out the items that were in the great room, cleaned the floor there, and put two coats of stain in the great room. Well, Andreas did that and I helped a bit with the first coat of the soy-based stain. Andreas did the first coat of soy-based sealer on the floor today. The sealer will soak in and then we'll put a second coat on and allow it to dry overnight.


The floors look like a marble or granite counter top. The concrete soaks in the stain differently, so it gives texture and variations in color. The Acri-Soy stain and sealer also came from Amicus Green Building Center.

I took yesterday off from work to paint and my goal was to finish all the painting on the main level of the house. It took a bit of time to get set up, and I realized quickly that I first needed to get the shop vac out to clean up a lot of drywall dust that was in the clerestory area. Then it became clear to me that in order for the paint to look high quality, I needed to do a second coat of primer on the walls before applying the final coat of paint. So I applied the primer in the guest bedroom, guest bathroom, and guest hallway and I put the final coat of paint on the walls in the guest bedroom and hallway. I had finished the great room walls and the pantry last week (right after returning home from our Convention) so almost all the paining (oops, I meant to type painting) on the West side of the house is done (just the guest bathroom to finish). Then I can do the second coat of primer and then paint in the master bedroom, closet, and bathroom. I should be able to finish that this Saturday.

There were a lot of interruptions yesterday, which were welcome (painting gets old after a bit, so it's nice to have a break every now and then). Several people came by to look at various projects so they can prepare quotes for us. Another possible subcontractor called to set a time to look at connecting the radiant floor heating system. Lowes was supposed to deliver our appliances, but I called the night before to reschedule for some time in November since the lot is a mud pit. Even though they called
later in the evening to confirm that the delivery was delayed, I got a call from the delivery folks stating my delivery was next on their list and they'd be at the house in 30-60 minutes. Oops. I explained the situation and they apologized, so it was a non-issue.

After Andreas finished his meetings at work yesterday, he came to the house and we installed some drywall on the basement ceiling together. We forgot to ask the drywall subcontractor to do a section of the ceiling at the stair landing and the hallway into the downstairs bedroom area. It took a few cuts of drywall and we installed the two sections together. I'll work on taping/mudding/sanding the drywall in the coming days.

While the inside is taking shape, we're hoping the weather will cooperate a bit so we can re-focus on the outside of the house. We started digging more trenches to finish the rainwater storage tank connections. Two trenches for overflow pipes and one trench to bring the water from the tanks to the house. (We've double-plumbed the toilets and hose bibs so they can run City water or rainwater.) Now if we ever again have a period of time without rain so the ground can dry out, we can finish the trenching, get the tanks connected, and then Bob DeMarr's crew can do the final grading.

Once the final grading is done, the subcontractors will install the rest of the cedar siding on the South and West sides of the house. Maryann's crew then can install the permeable paver walkways and we can lay truck loads of mulch over the clay soil to help stabilize the soil and make the lot look much, much nicer than it currently does. And then there's decking to be built, but that's a blog posting of its own - another expensive disaster we're trying to mitigate, compliments of Aaron/Cornerstone Building Services.

Each day's
accomplishments brings us a step closer to moving in the house. It's important to recognize how far we've come, since it's easy to see how far we have yet to go.


Monday, October 12, 2009

It Takes a Village.... to Raise a House?






We've been doing a lot at our house this past last week. So much that I haven't been able to blog about it. Wonderful family and friends have helped.

The drywall's done (hung, taped, mudded, sanded, paid for).
Interior walls have been primed....soon to be painted (Thanks, Bill!)
Companies have come by to give quotes for the deck.
Maryann from Terra Landscape came by to measure in order to prepare a quote for the walkway. We're getting quotes for pavers for a walkway. I'm tired of walking through mud to get to the house.
Erika came by to review her landscape design.
The interior stair landing has been built (Thanks, Larry!).
The interior stairs have been placed and (mostly) connected. I have a few more screws to put in.
The remaining cedar for the exterior has been stained (Thanks Mom!)
The rainwater tanks have been connected to one another; outflow and inflow are yet to be done.
When buying the no VOC paint at Amicus Green Building in Kensington, MD, we "window shopped" for some tile and decided to purchase some really beautiful tile there.

And more, but those are the highlights.

I gained about 10lbs this weekend - not from stress, but from my Mom's wonderful cooking. Mom and Bill came Saturday and helped through today (Monday). Not only did they help with a multitude of projects around the house, but they prepared meals for each day, all of which were incredibly delicious. I need to work harder on the house to lose some weight now!

Our architect and one of his staff came by today to review the progress and next steps. They're going to refer some folks to us for deck construction, interior finish carpentry, etc.