Getting Close...Inside and Outside

Jeff Gunther with Grove Construction did an outstanding job installing the cedar on the west side of the house.

The crew from Terra Landscape & Design, laying the permeable pavers.

Upstairs guest bathroom tub/shower. The fixtures are from Ferguson; the tile from Amicus.

Master bathroom's Duravit sink.

Master bathroom's Duravit wall-mounted toilet, with dual flush.

2 comments:

  1. Happy Anniversary!!!

    I believe it was on Martin Luther King day last year (which would have been January 19 in 2009) that you broke ground!

    (See http://fallschurcherdhaus.blogspot.com/2009/01/let-us-break-ground-together.html)

    ReplyDelete
  2. Hi Dave, thanks. That post was the ceremonial groundbreaking. The actual groundbreaking wasn't until the first 1/2 of February that we actually broke ground. I don't recall whether it was February 9 or February 10. So we're almost at the 1 year under construction point. Andreas said he thought it would take 12 months to build, and it looks like he was right (as usual)!

    ReplyDelete