This marks our 100th post. And I'm happy to report there's been some more progress. In the past couple of days, our recycling dumpster was hauled away. We filled two dumpsters during the construction, which is less than 1/2 what typical construction sends to the landfill. And many of the items placed in our dumpster will be recycled instead of dumped.
Thursday, July 30, 2009
100th Blog Post
This marks our 100th post. And I'm happy to report there's been some more progress. In the past couple of days, our recycling dumpster was hauled away. We filled two dumpsters during the construction, which is less than 1/2 what typical construction sends to the landfill. And many of the items placed in our dumpster will be recycled instead of dumped.
Sunday, July 26, 2009
Staining Cedar





There's a particular look we were going for with the cedar stain and I think we're achieving it! At Amicus Green Building Center in Kensington, MD, we purchased a "one coat only" stain that's made from plant oils. The color we chose is mahogany, which will give the beautiful orange-ish, red color we'd like for the cedar. This will be beautiful with the lighter color stucco below and the dark metal roof. As I mentioned in an earlier post, the cedar arrived on Friday. I had ordered the stain from Amicus a couple of weeks ago, it arrived, so I picked it up after work on Friday evening and I spent the weekend staining. I got most of the shiplap cedar siding done on three sides, and all of the cedar trim on one side. I only made it through a couple of the longer cedar fascia boards before running off to a friend's 60th birthday dinner. In any case, I made a lot of progress and Andreas is off tomorrow so he'll pick up where I left off - finishing the cedar fascia boards and the final side of the cedar shiplap siding. I have some more shiplap to stain for the outdoor shower, but there's not a big rush to get than completed since I'll build that fencing around the shower at my leisure. Here are some pics of the stain and the wood - both finished and unfinished.
Progress!


Saturday, July 25, 2009
TW Perry Rocks
Thursday, July 23, 2009
The Big Dig


Saturday, July 4, 2009
EIFS, Act 5
Saturday, June 27, 2009
EIFS, Act 4
EIFS, Act 3
Friday, June 26, 2009
Our neighbors, our heroes
Without you, our neighbors, this would not be the neighborhood we'd want to live in. Thank you!
Tuesday, June 23, 2009
Tight as ... Tupperware
I've been spending a few days on and off over the last few weeks airsealing around the house: mostly where the concrete meets the mud sill, and where the CEB wall meets the top plate. All you need is a caulk gun, a LOT of caulk (I used a GE product, Silicone I, but any silicone-based caulk will work well), and off you go. Believe it or not, this is one of the most energy efficient things you can do to your house (move over, replacement windows!) - so efficient in fact, that EarthCraft standards mandate airsealing in lots of places. Most of them I've covered now - for the rest of the airsealing (and firestopping), the professionals from Southland Insulators will take over before they apply sprayfoam insulation to our roof, the clerestory window area, and the bandjoist. More on that in a future post.
For now, just a picture of a nice, thick, bead of Silicone caulk between the top of the CEB wall and the top plate. Often under-appreciated, but such an important component of building green.
EIFS, Act 2
Claudia and her EIFS crew wrapped the house in extruded styrofoam today. (Yes, there are different kinds of styrofoam: expanded - the white, bubbles-pressed-together looking kind; and extruded - which is much smoother in texture.) The advantage of extruded styrofoam is that (a) it has a greater R-value (R-5 per inch ... we have three inches, so a total of R-15) and (b) it is a water barrier (by contrast, expanded styrofoam is about as permeable as a sieve).
For now, the house looks like a big freezer box. The next few steps are to sand the styrofoam smooth; embed a nylon mesh in another scratchcoat, and then to apply the final EIFS coat. In a week, weather permitting, we should have the final product.
Monday, June 22, 2009
EIFS and Window Framing Progress




Thanks, Jeff!

Saturday, June 20, 2009
Wrong Windows Removed, More Flooding
Puddles, Puddles everywhere
This rain is driving me nuts! Bartley returned on Tuesday with the repaired machine to continue the grading work. The clay dirt was too wet for them to complete the job, so they'll have to come back again after 4-5 days of no rain, which will give the dirt time to dry out. At this rate, I don't think we'll ever have that kind of dry spell!
While doing the grading, the guy from Bartley drove right into the corner of our house, completely destroying three of the extruded foam board panels. Hopefully when the EIFS installers come, they will be able to easily add new foam board there and make it like new. You can see the foam board we cut away in the fourth picture below.
On Thursday, when I was in an important all-day meeting, I received an email from my neighbor to the South stating that our silt fence needed attention. You will see in the final picture where the torrential rain storms that afternoon, following days of steady rain, were just too much for any silt fence to handle. I went that night and put up an extra layer of new silt fencing, hoping that holds in the future. Once the grading is complete, hopefully this won't occur again. If it does, we might be forced to incur even more water mitigation expenses (which we cannot afford) in terms of draintile to prevent water run-off.
Prepping for EIFS Installation
In order to secure the best possible price for the EIFS installation (that's the extruded foam board and synthetic stucco system on the exterior of the house), we agreed to attach the basement extruded foam board to the house using TapCon concrete screws. That saved time for the installers, which saved us money. Andreas did the work, which took a few hours, about 100 TapCon screws with large washers, and five concrete drill bits to pre-drill the screw hole. Doesn't it look great? Now the EIFS installers will be able to nicely match their foam board with ours for a professional installation.
Wednesday, June 10, 2009
Grading in Progress